Industry news|2022-06-06| admin
The installation of the planetary gearbox is a relatively simple process, but some details need to be paid attention to during the installation process. The installation process of the planetary gearbox is roughly divided into three steps: inspection size, installation, and testing. The main thing is to confirm the planetary gear. The coaxiality of the gearbox during installation will have a great impact, so let's learn about the installation process of the planetary gearbox and some precautions!
Before installing the planetary gearbox and the motor, it is necessary to confirm whether they are in good condition, and it is necessary to check whether the dimensions of the connected parts match, mainly referring to whether the installation size between the motor and the gearbox is correct.
Send the screws of the dust-proof holes on the outer side of the planetary gearbox, adjust the position to align the side holes and the dust-proof holes, remove the motor shaft key, and carry out anti-rust treatment on the installation parts of the motor and the gearbox to ensure the tightness of the connection and the later operation. of fluency.
When connecting, it is necessary to ensure that the coaxiality between the two is consistent. If it is inconsistent, it will affect the later operation, wear the internal gear of the gearbox or break the shaft. During the installation process, it is forbidden to hit the gearbox with a hammer to prevent damage caused by excessive axial force or radial force.
When the gearbox and the motor are connected, first install the diagonal screws to ensure uniform force, then install the other two diagonal bolts, tighten the four mounting bolts one by one, and finally tighten the captive screws on both sides, some high-precision installation requires the use of a torque wrench.
After the gearbox is installed, it needs to be fixed on the bracket, and the stability of the installation needs to be ensured. If the gearbox is unstable during high-speed operation, it may cause vibration and external noise, which will indirectly affect the coaxiality of the installation. When gears or other components are externally installed during transmission, protective devices need to be installed. After the installation is completed, check the stability and flexibility of the installation parts in turn, and the idling test can be carried out. The operation process should be relatively stable, without obvious vibration and noise. When there are some abnormal phenomena, the problem should be eliminated.
The planetary gearbox needs to be carefully installed during the installation process. Good installation can achieve twice the result with half the effort. Installation according to standard procedures can save a lot of maintenance costs in the later period. If the coaxiality is inconsistent during installation, it will have a great impact on the later use and the gearbox itself. Therefore, during the installation of the gearbox, attention must be paid to the coaxiality of the gearbox and some details.
| 奶大灬大灬大灬硬灬爽灬无码视频 | 嫩BBB搡BBBB搡BBBB | 麻豆成人爽a毛片免费啪啪 麻豆精品国产传媒美女网站 | 丰满少妇伦精品无码专区 | 日韩免费视频在线观看 | 如何观看波多野结衣A片 | 韩国污污色情网站在线免费观看 | 黃色毛片A片免费高潮 | 免费无码色情日本午夜视频 | 国产精品久久久久久久久久久久人四虎 | 午夜国产三级理伦片 | 台湾一级婬片A片AAA免费 | 91人妻人人爽人人添麻豆 | 99久久国产自偷自自偷免费一区 | 夜夜穞天天穞狠狠穞AV美女按摩 | 少妇高潮精品一区二区三区 | 欧一美一交一乱一视一频二区 | 一区二区三区日韩中文字幕 | 亚洲乱色AV看AV毛片果冻传媒 | 亚洲91骚熟妇蜜桃导航在线看 | 公天天吃我奶躁我的在线观看强奸 | 丁香婷婷五月色成人网站 | 精品人妻少妇嫩草Aⅴ无码专区 | 国产三级久久久精品麻豆三级 | 波多野结衣午夜福利 | 国产睡熟迷奷系列精品 | 男操女爱爱视频免费看 | 国产一级二级在线观看 | 国产无遮挡AAA片爽爽 | 国产露脸农村妇女对白 | 91精品无码少妇a v久久69 | 国产精品三级片久色 | 色欲av久久人妻蜜臀免费网站 | 日韩中文字幕区一区有砖一区 | 日韩免费一级无码婬片AA片软件 | 国产电影Www夜色视频 | 免费无码婬A片在线视频夜场 | 国产白丝袜美女久久久久 | 国产人妻刺激对白theporm | 日韩互交免费网址 |